HWY CENTRAL ST over RR MBTA/BMRR

1.6 KM W OF JCT SR28&38 · County 017, Massachusetts · Built 1889 · 2 Lanes · 7,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S170103G7DOT634
Year Built
1889
Reconstructed
1985
Length
24.1 m (79.1 ft)
Max Span
20.7 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
7,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,831,000
Total Project Cost
$2,747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.