ST 28 MCGRATH HWY over RR MBTA/BMRR

.1 MI S OF PEARL ST · County 017, Massachusetts · Built 1926 · 6 Lanes · 32,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
S170224E2DOTNBI
Year Built
1926
Reconstructed
1983
Length
53 m (173.9 ft)
Max Span
52.3 m
Width
32.9 m (107.9 ft)
Lanes
6
Daily Traffic
32,000
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,874,000
Total Project Cost
$40,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.