HWY CROSS ST over RR MBTA/BMRR

1.6 KM S JCT SR28&38 · County 017, Massachusetts · Built 1928 · 2 Lanes · 8,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S170053G2DOT634
Year Built
1928
Reconstructed
2014
Length
34.4 m (112.9 ft)
Max Span
32.9 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
8,500
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,351,000
Total Project Cost
$11,027,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.