ST 28 MCGRATH HWY over HWY GILMAN ST

.1 MI S OF EVERETT AVE · County 017, Massachusetts · Built 2016 · 6 Lanes · 46,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S17025BDWDOTNBI
Year Built
2016
Length
14.2 m (46.6 ft)
Max Span
12.9 m
Width
33.4 m (109.6 ft)
Lanes
6
Daily Traffic
46,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$515,000
Total Project Cost
$773,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.