HWY PROSPECT ST over RR MBTA/BMRR

1.5 MI N OF HARVARD BR. · County 017, Massachusetts · Built 1933 · 2 Lanes · 14,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S170203GBDOT634
Year Built
1933
Reconstructed
1984
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
14,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,258,000
Total Project Cost
$1,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.