HWY LOWELL ST over RR MBTA/BMRR

1.8 KM NW OF JCT SR28&38 · County 017, Massachusetts · Built 2006 · 2 Lanes · 6,077 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S17011AW2DOT634
Year Built
2006
Length
25.9 m (85 ft)
Max Span
24.5 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
6,077
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,229,000
Total Project Cost
$3,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.