I 93 RP TO I93 NB over I 93

1.0 KM NW JCT I93&SR28 · County 017, Massachusetts · Built 1972 · 1 Lanes · 16,231 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M120443FCDOTNBI
Year Built
1972
Length
63.1 m (207 ft)
Max Span
30.5 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
16,231
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,657,000
Total Project Cost
$5,486,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.