I 93 over ST 16 MYST VAL PKY

1 MI S OF JCT I93 & SR60 · County 017, Massachusetts · Built 1960 · 8 Lanes · 182,420 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
M120393B3DOTNBI
Year Built
1960
Reconstructed
2011
Length
99.1 m (325.1 ft)
Max Span
25.9 m
Width
42.5 m (139.4 ft)
Lanes
8
Daily Traffic
182,420
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$27,592,000
Total Project Cost
$41,389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.