I 93 over ST 60 EB/SALEM ST

1.1 KM S OF ROSVELT CIR. · County 017, Massachusetts · Built 1961 · 8 Lanes · 266,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M120273B6DOTNBI
Year Built
1961
Reconstructed
2011
Length
48.8 m (160.1 ft)
Max Span
23.5 m
Width
42.5 m (139.4 ft)
Lanes
8
Daily Traffic
266,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,704,000
Total Project Cost
$4,057,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.