I 93 over WATER MYSTIC RIVER

.8 KM S OF JCT I93&SR60 · County 017, Massachusetts · Built 1963 · 8 Lanes · 250,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M120363B4DOTNBI
Year Built
1963
Reconstructed
2011
Length
78.6 m (257.9 ft)
Max Span
25.9 m
Width
42.5 m (139.4 ft)
Lanes
8
Daily Traffic
250,350
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,360,000
Total Project Cost
$6,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.