I 93 over HWY RIVERSIDE AVE

1000FT S OF JCT 193&SR60 · County 017, Massachusetts · Built 1961 · 8 Lanes · 179,680 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M120253B5DOTNBI
Year Built
1961
Reconstructed
2011
Length
62.8 m (206 ft)
Max Span
22.9 m
Width
44 m (144.4 ft)
Lanes
8
Daily Traffic
179,680
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,996,000
Total Project Cost
$26,995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.