I 93 over HWY WEBSTER ST

.5 MI S OF ROOSVELT CIR. · County 017, Massachusetts · Built 1961 · 9 Lanes · 194,827 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M120293B8DOTNBI
Year Built
1961
Reconstructed
2011
Length
40.8 m (133.9 ft)
Max Span
17.1 m
Width
44 m (144.4 ft)
Lanes
9
Daily Traffic
194,827
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,343,000
Total Project Cost
$3,515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.