HWY COLLEGE AVE over RR MBTA/BMRR

1.6 KM W JCT I93&SR16 · County 017, Massachusetts · Built 1997 · 2 Lanes · 14,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
M12012AN4DOT634
Year Built
1997
Length
25.4 m (83.3 ft)
Max Span
22.4 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
14,100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,330,000
Total Project Cost
$3,496,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.