I 93 over ST 28 & ST38 & TEMPLE ST

3.2 KM N OF JCT I-93&US-1 · County 017, Massachusetts · Built 1973 · 8 Lanes · 143,941 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S170313BHDOTNBI
Year Built
1973
Length
716.9 m (2352 ft)
Max Span
32.6 m
Width
42.4 m (139.1 ft)
Lanes
8
Daily Traffic
143,941
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$197,362,000
Total Project Cost
$296,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.