I 93 NB ON RAMP over COMB MYSTIC AV & PEDEST

3.2 KM N OF JCT I93&US1 · County 017, Massachusetts · Built 1973 · 1 Lanes · 13,464 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S170333BLDOTNBI
Year Built
1973
Length
151.8 m (498 ft)
Max Span
26.2 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
13,464
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,684,000
Total Project Cost
$13,027,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.