I 93 NB OFFRAMP over ST 38 NB/MYSTIC AVE

3.2 KM N OF JCT I93&US1 · County 017, Massachusetts · Built 1973 · 1 Lanes · 19,267 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
S170363BKDOTNBI
Year Built
1973
Length
113.4 m (372 ft)
Max Span
24.4 m
Width
11.7 m (38.4 ft)
Lanes
1
Daily Traffic
19,267
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,499,000
Total Project Cost
$17,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.