ST 62 MAPLE ST over WATER IPSWICH RIVER

1.6 KM E ST114 · County 009, Massachusetts · Built 1922 · 2 Lanes · 26,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
4
Poor
Substructure
3
Serious

Bridge Details

Structure #
M2000331LDOTNBI
Year Built
1922
Length
14.7 m (48.2 ft)
Max Span
7.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
26,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,200,000
Total Project Cost
$4,801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.