HWY PEABODY ST over WATER IPSWICH RIVER

0.3 MI W OF BOXFORD RD · County 009, Massachusetts · Built 1985 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M200022RBMUNNBI
Year Built
1985
Length
18 m (59.1 ft)
Max Span
16.2 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
3,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,370,000
Total Project Cost
$2,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.