ST114 N MAIN ST over WATER EMERSON BROOK
1 MI N MIDDLETON TOWN HAL · County 009, Massachusetts · Built 1962 · 2 Lanes · 30,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.603167, -71.028842
This bridge is in worse condition than 39.1% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 64 years old.
Nearby Bridges
HWY PEABODY ST over WATER BOSTON BROOK
Built 1957
ST 62 MAPLE ST over WATER IPSWICH RIVER
Built 1922
HWY PEABODY ST over WATER IPSWICH RIVER
Built 1985
HWY BOSTON ST over WATER IPSWICH RIVER
Built 2002
HWY EAST ST over WATER IPSWICH RIVER
Built 1978
ST114 ANDOVER ST over WATER IPSWICH RIVER
Built 1954
ST 62 WASHNGTON ST over WATER IPSWICH RIVER
Built 1947
I 95 SB over WATER IPSWICH RIVER
Built 1950
I 95 NB over WATER IPSWICH RIVER
Built 1951
ST 62 PARK ST over WATER IPSWICH RIVER
Built 1903
Bridge Details
- Structure #
- M200102UKDOTNBI
- Year Built
- 1962
- Length
- 14.4 m (47.2 ft)
- Max Span
- 13.8 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 30,200
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,607,000
- Total Project Cost
- $2,411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.