ST114 ANDOVER ST over WATER IPSWICH RIVER
0.25 MI E OF RIVER ST · County 009, Massachusetts · Built 1954 · 2 Lanes · 32,949 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 3 | Serious |
Location
42.573953, -70.993483
This bridge is in worse condition than 95.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
US 1 NB & SB over HWY CENTRE ST
Built 2012
US 1 SB/NEWBRY ST over ST114 ANDOVER ST
Built 1950
HWY CENTRE ST over I 95
Built 1969
US 1 NB/NEWBRY ST over ST114 ANDOVER ST
Built 1950
I 95 SB over ST114 ANDOVER ST
Built 1969
I 95 NB over ST114 ANDOVER ST
Built 1969
US 1 SB/NEWBRY ST over ST 62 MAPLE ST
Built 1950
US 1 NB/NEWBRY ST over ST 62 MAPLE ST
Built 1950
ST 62 MAPLE ST over WATER IPSWICH RIVER
Built 1922
I 95 SB over ST 62 MAPLE ST
Built 1972
Bridge Details
- Structure #
- D030092UHDOTNBI
- Year Built
- 1954
- Length
- 13.3 m (43.6 ft)
- Max Span
- 12.8 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 32,949
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,927,000
- Total Project Cost
- $4,391,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.