US 1 NB/NEWBRY ST over ST 62 MAPLE ST

1.6 MI N OF ST-114 · County 009, Massachusetts · Built 1950 · 2 Lanes · 23,230 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
D030162T6DOTNBI
Year Built
1950
Reconstructed
2009
Length
29.9 m (98.1 ft)
Max Span
13.7 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
23,230
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$702,000
Total Project Cost
$1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.