I 95 SB over ST 62 MAPLE ST
1.6 MI N ST114 · County 009, Massachusetts · Built 1972 · 4 Lanes · 38,090 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.582092, -70.964089
This bridge is in worse condition than 83.6% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 54 years old.
Nearby Bridges
I 95 NB over ST 62 MAPLE ST
Built 1972
US 1 NB/NEWBRY ST over ST 62 MAPLE ST
Built 1950
US 1 SB/NEWBRY ST over ST 62 MAPLE ST
Built 1950
US 1 NB/NEWBRY ST over I 95
Built 1972
US 1 SB/NEWBRY ST over I 95
Built 1972
US 1 NB & SB over HWY CENTRE ST
Built 2012
HWY CENTRE ST over I 95
Built 1969
ST114 ANDOVER ST over WATER IPSWICH RIVER
Built 1954
US 1 SB/NEWBRY ST over ST114 ANDOVER ST
Built 1950
US 1 NB/NEWBRY ST over ST114 ANDOVER ST
Built 1950
Bridge Details
- Structure #
- D030332VHDOTNBI
- Year Built
- 1972
- Length
- 39 m (128 ft)
- Max Span
- 18.9 m
- Width
- 23.8 m (78.1 ft)
- Lanes
- 4
- Daily Traffic
- 38,090
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,181,000
- Total Project Cost
- $9,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.