US 1 NB & SB over HWY CENTRE ST

0.7 MI N OF RTE 114 · County 009, Massachusetts · Built 2012 · 6 Lanes · 46,414 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
D03026B1TDOTNBI
Year Built
2012
Length
43.6 m (143 ft)
Max Span
17.7 m
Width
37.8 m (124 ft)
Lanes
6
Daily Traffic
46,414
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,457,000
Total Project Cost
$6,686,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.