I 95 SB over ST114 ANDOVER ST

1.5 MI N ST62 · County 009, Massachusetts · Built 1969 · 3 Lanes · 40,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
D030312VEDOTNBI
Year Built
1969
Length
42.7 m (140.1 ft)
Max Span
41.8 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
40,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,863,000
Total Project Cost
$8,795,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.