I 95 SB over OTHER MBTA - BIKE TRAIL

.1 MI N LOWELL STREET · County 009, Massachusetts · Built 1974 · 4 Lanes · 42,634 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
P030362VXDOTNBI
Year Built
1974
Reconstructed
1987
Length
31 m (101.7 ft)
Max Span
27.4 m
Width
26 m (85.3 ft)
Lanes
4
Daily Traffic
42,634
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,402,000
Total Project Cost
$8,104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.