I 95 SB CONNECTOR over US 1 NB/NEWBURY ST

.1 MI E US1 · County 009, Massachusetts · Built 1975 · 2 Lanes · 28,966 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
P030442VTDOTNBI
Year Built
1975
Length
34.1 m (111.9 ft)
Max Span
33.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
28,966
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,954,000
Total Project Cost
$4,432,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.