US 1 NB/NEWBRY ST over ST114 ANDOVER ST

1.6 MI S ST62 · County 009, Massachusetts · Built 1950 · 2 Lanes · 51,522 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
D030172T2DOTNBI
Year Built
1950
Length
24.4 m (80.1 ft)
Max Span
11.6 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
51,522
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,403,000
Total Project Cost
$3,605,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.