I 95 NB over ST 62 MAPLE ST

1.6 MI N ST114 · County 009, Massachusetts · Built 1972 · 4 Lanes · 36,201 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
D030332VGDOTNBI
Year Built
1972
Length
38.4 m (126 ft)
Max Span
18.9 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
36,201
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,317,000
Total Project Cost
$7,976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.