US 1 NB/NEWBRY ST over I 95

.5 MI N OF ST-62 · County 009, Massachusetts · Built 1972 · 2 Lanes · 24,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
D030342T8DOTNBI
Year Built
1972
Length
101.8 m (334 ft)
Max Span
50.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
24,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,476,000
Total Project Cost
$12,715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.