HWY EAST ST over WATER IPSWICH RIVER

2.7 KM NORTH ST 62 · County 009, Massachusetts · Built 1978 · 2 Lanes · 11,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M200012QAMUNNBI
Year Built
1978
Length
13.1 m (43 ft)
Max Span
12.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
11,100
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,200,000
Total Project Cost
$1,801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.