I 95 NB over HWY FULLER LN

.9 MI N IPSWICH RIVER · County 009, Massachusetts · Built 1974 · 4 Lanes · 43,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B190082VADOTNBI
Year Built
1974
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
43,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,644,000
Total Project Cost
$2,467,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.