HWY JULIAN ST over WATER SOUTH RIVER
EAST OF BAYBERRY ROAD · County 023, Massachusetts · Built 2010 · 2 Lanes · 786 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.131344, -70.688172
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 16 years old.
Nearby Bridges
HWY SEA ST over WATER SOUTH RIVER
Built 2010
ST 3 A/MAIN ST over WATER SOUTH RIVER
Built 1947
ST 3 A/MAIN ST over WATER NORTH RIVER
Built 2001
HWY JOS DRIEBEEK over WATER GREEN HARBOR RIVER
Built 1985
HWY BEACH ST over WATER CUT RIVER
Built 2020
HWY NORTH ST over ST 3 PILGRIM HWY
Built 1962
ST 3 NB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 3 SB/PLGRM HWY over ST139 CHURCH ST
Built 1961
HWY TEMPLE ST over ST 3 PILGRIM HWY
Built 1962
HWY STOCKBDGE RD over RR MBTA
Built 2005
Bridge Details
- Structure #
- M07019B30MUNNBI
- Year Built
- 2010
- Length
- 61.7 m (202.4 ft)
- Max Span
- 12.5 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 786
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,092,000
- Total Project Cost
- $4,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.