HWY JULIAN ST over WATER SOUTH RIVER

EAST OF BAYBERRY ROAD · County 023, Massachusetts · Built 2010 · 2 Lanes · 786 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M07019B30MUNNBI
Year Built
2010
Length
61.7 m (202.4 ft)
Max Span
12.5 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
786
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,092,000
Total Project Cost
$4,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.