ST 3 SB/PLGRM HWY over ST139 CHURCH ST

.5 M N OF MARSHFIELD TL · County 023, Massachusetts · Built 1961 · 2 Lanes · 26,073 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P05009490DOTNBI
Year Built
1961
Length
50.4 m (165.4 ft)
Max Span
24.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
26,073
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,735,000
Total Project Cost
$7,103,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.