HWY TEMPLE ST over ST 3 PILGRIM HWY

1 M W OF MARSHFIELD TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 786 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D140124AUDOTNBI
Year Built
1962
Length
78 m (255.9 ft)
Max Span
20.1 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
786
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,955,000
Total Project Cost
$4,433,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.