HWY NORTH ST over ST 3 PILGRIM HWY

.5 MI W OF MARSHFIELD TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
D140144AVDOTNBI
Year Built
1962
Length
76.5 m (251 ft)
Max Span
19.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,249,000
Total Project Cost
$9,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.