HWY NORTH ST over ST 3 PILGRIM HWY
.5 MI W OF MARSHFIELD TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.088019, -70.744661
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 64 years old.
Nearby Bridges
HWY TEMPLE ST over ST 3 PILGRIM HWY
Built 1962
ST 3 A/MAIN ST over WATER SOUTH RIVER
Built 1947
ST 3 NB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 SB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 NB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 3 SB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 14 CONGRESS ST over ST 3 PILGRIM HWY
Built 1962
ST 3 SB over WATER NORTH RIVER
Built 1961
ST 3 NB over WATER NORTH RIVER
Built 1961
HWY WASHNGTON ST over WATER NORTH RIVER
Built 1904
Bridge Details
- Structure #
- D140144AVDOTNBI
- Year Built
- 1962
- Length
- 76.5 m (251 ft)
- Max Span
- 19.5 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,249,000
- Total Project Cost
- $9,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.