ST 3 A/MAIN ST over WATER SOUTH RIVER
AT JCT.139 · County 023, Massachusetts · Built 1947 · 2 Lanes · 28,241 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.094589, -70.718114
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 79 years old.
Nearby Bridges
HWY NORTH ST over ST 3 PILGRIM HWY
Built 1962
HWY TEMPLE ST over ST 3 PILGRIM HWY
Built 1962
ST 3 NB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 SB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 NB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 3 SB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 14 CONGRESS ST over ST 3 PILGRIM HWY
Built 1962
HWY JULIAN ST over WATER SOUTH RIVER
Built 2010
HWY SEA ST over WATER SOUTH RIVER
Built 2010
ST 3 NB over WATER NORTH RIVER
Built 1961
Bridge Details
- Structure #
- M0700447JDOTNBI
- Year Built
- 1947
- Length
- 9.8 m (32.2 ft)
- Max Span
- 8.2 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 28,241
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $838,000
- Total Project Cost
- $1,258,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.