ST 3 A/MAIN ST over WATER SOUTH RIVER

AT JCT.139 · County 023, Massachusetts · Built 1947 · 2 Lanes · 28,241 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
M0700447JDOTNBI
Year Built
1947
Length
9.8 m (32.2 ft)
Max Span
8.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
28,241
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$838,000
Total Project Cost
$1,258,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.