ST 14 CONGRESS ST over ST 3 PILGRIM HWY
2.25 M W OF PEMBROKE TL · County 023, Massachusetts · Built 1962 · 2 Lanes · 16,940 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.055528, -70.725294
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 64 years old.
Nearby Bridges
ST 3 SB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 NB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
HWY EAST ST over ST 3 PILGRIM HWY
Built 1962
HWY TEMPLE ST over ST 3 PILGRIM HWY
Built 1962
HWY ELM ST over ST 3 PILGRIM HWY
Built 1962
HWY NORTH ST over ST 3 PILGRIM HWY
Built 1962
ST 3 A/MAIN ST over WATER SOUTH RIVER
Built 1947
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
HWY POWDER PT AV over WATER DUXBURY BAY
Built 1987
HWY CANAL ST over WATER CUT RIVER
Built 1949
Bridge Details
- Structure #
- D1400949QDOTNBI
- Year Built
- 1962
- Length
- 78.9 m (258.9 ft)
- Max Span
- 21.3 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 16,940
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,642,000
- Total Project Cost
- $11,464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.