ST 3 A/TREMONT ST over ST 3 PILGRIM HWY

.1M EAST OF JCT RTE 53 · County 023, Massachusetts · Built 1996 · 4 Lanes · 28,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
D14006AEEDOTNBI
Year Built
1996
Length
44 m (144.4 ft)
Max Span
21.4 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
28,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,344,000
Total Project Cost
$8,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.