ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
.1M EAST OF JCT RTE 53 · County 023, Massachusetts · Built 1996 · 4 Lanes · 28,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.013961, -70.726539
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 30 years old.
Nearby Bridges
HWY ELM ST over ST 3 PILGRIM HWY
Built 1962
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 3 PILGRIM HWY over RR MBTA
Built 1954
ST 27 PEMBROKE ST over RR MBTA
Built 1958
HWY EAST ST over ST 3 PILGRIM HWY
Built 1962
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
HWY ELM ST over WATER JONES RIVER
Built 2014
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
Bridge Details
- Structure #
- D14006AEEDOTNBI
- Year Built
- 1996
- Length
- 44 m (144.4 ft)
- Max Span
- 21.4 m
- Width
- 18.2 m (59.7 ft)
- Lanes
- 4
- Daily Traffic
- 28,900
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,344,000
- Total Project Cost
- $8,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.