ST 3 PILGRIM HWY over WATER JONES RIVER

.8 MI NORTH OF RTE 3A · County 023, Massachusetts · Built 1955 · 4 Lanes · 128,534 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
K01011AGDDOTNBI
Year Built
1955
Reconstructed
1978
Length
74.1 m (243.1 ft)
Max Span
24.4 m
Width
31.7 m (104 ft)
Lanes
4
Daily Traffic
128,534
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,087,000
Total Project Cost
$4,631,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.