ST 3 PILGRIM HWY over WATER JONES RIVER
.8 MI NORTH OF RTE 3A · County 023, Massachusetts · Built 1955 · 4 Lanes · 128,534 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.997106, -70.720961
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over RR MBTA
Built 1954
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST 3 A/MAIN ST over ST 3 PILGRIM HWY
Built 1948
HWY ELM ST over WATER JONES RIVER
Built 2014
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
HWY HOWLANDS LN over RR MBTA
Built 1850
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
HWY SMITHS LN over ST 3 PILGRIM HWY
Built 1958
Bridge Details
- Structure #
- K01011AGDDOTNBI
- Year Built
- 1955
- Reconstructed
- 1978
- Length
- 74.1 m (243.1 ft)
- Max Span
- 24.4 m
- Width
- 31.7 m (104 ft)
- Lanes
- 4
- Daily Traffic
- 128,534
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,087,000
- Total Project Cost
- $4,631,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.