ST 3 A/MAIN ST over ST 3 PILGRIM HWY
.8 MI N OF PLYMOUTH TL · County 023, Massachusetts · Built 1948 · 2 Lanes · 29,612 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.988111, -70.717492
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 78 years old.
Nearby Bridges
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST 3 PILGRIM HWY over RR MBTA
Built 1954
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
HWY HOWLANDS LN over RR MBTA
Built 1850
HWY ELM ST over WATER JONES RIVER
Built 2014
HWY SMITHS LN over ST 3 PILGRIM HWY
Built 1958
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
ST 3 NB/PLGRM HWY over HWY CHERRY ST
Built 1958
Bridge Details
- Structure #
- K0101546UDOTNBI
- Year Built
- 1948
- Reconstructed
- 2003
- Length
- 36.6 m (120.1 ft)
- Max Span
- 17.7 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 29,612
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $692,000
- Total Project Cost
- $1,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.