ST 3 A/MAIN ST over ST 3 PILGRIM HWY

.8 MI N OF PLYMOUTH TL · County 023, Massachusetts · Built 1948 · 2 Lanes · 29,612 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
K0101546UDOTNBI
Year Built
1948
Reconstructed
2003
Length
36.6 m (120.1 ft)
Max Span
17.7 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
29,612
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$692,000
Total Project Cost
$1,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.