HWY SMITHS LN over ST 3 PILGRIM HWY

.5 MI N OF PLYMOUTH TL · County 023, Massachusetts · Built 1958 · 2 Lanes · 27,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
K010144AWDOTNBI
Year Built
1958
Length
58.8 m (192.9 ft)
Max Span
18.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
27,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,018,000
Total Project Cost
$7,528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.