US 44 WB (CON A) over ST 3 PILGRIM HWY

1.1 KM S OF KINGSTON TL · County 023, Massachusetts · Built 2003 · 1 Lanes · 10,571 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
P13048AEJDOTNBI
Year Built
2003
Length
49.9 m (163.7 ft)
Max Span
24.5 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
10,571
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,818,000
Total Project Cost
$5,728,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.