ST 3 NB/PLGRM HWY over HWY CHERRY ST

1.2 M N OF RTE 44 · County 023, Massachusetts · Built 1958 · 3 Lanes · 28,030 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P1304049DDOTNBI
Year Built
1958
Reconstructed
1978
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
28,030
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,741,000
Total Project Cost
$2,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.