ST 3 PILGRIM HWY over HWY LANDING RD
2 M N OF PLYMOUTH TL · County 023, Massachusetts · Built 1955 · 4 Lanes · 55,678 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.998219, -70.721525
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 3 PILGRIM HWY over RR MBTA
Built 1954
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST 3 A/MAIN ST over ST 3 PILGRIM HWY
Built 1948
HWY ELM ST over WATER JONES RIVER
Built 2014
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
HWY HOWLANDS LN over RR MBTA
Built 1850
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
ST 27 PEMBROKE ST over RR MBTA
Built 1958
Bridge Details
- Structure #
- K01010AF0DOTNBI
- Year Built
- 1955
- Reconstructed
- 1979
- Length
- 34.7 m (113.8 ft)
- Max Span
- 13.7 m
- Width
- 31.7 m (104 ft)
- Lanes
- 4
- Daily Traffic
- 55,678
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,203,000
- Total Project Cost
- $10,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.