ST 3 PILGRIM HWY over HWY LANDING RD

2 M N OF PLYMOUTH TL · County 023, Massachusetts · Built 1955 · 4 Lanes · 55,678 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
K01010AF0DOTNBI
Year Built
1955
Reconstructed
1979
Length
34.7 m (113.8 ft)
Max Span
13.7 m
Width
31.7 m (104 ft)
Lanes
4
Daily Traffic
55,678
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,203,000
Total Project Cost
$10,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.