HWY ELM ST over WATER JONES RIVER
.15 MI S OF RTE 27 · County 023, Massachusetts · Built 2014 · 2 Lanes · 5,043 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
41.990722, -70.734883
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 12 years old.
Nearby Bridges
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over RR MBTA
Built 1954
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
ST 3 A/MAIN ST over ST 3 PILGRIM HWY
Built 1948
ST 27 PEMBROKE ST over RR MBTA
Built 1958
HWY SMITHS LN over ST 3 PILGRIM HWY
Built 1958
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
Bridge Details
- Structure #
- K01002BBQMUNNBI
- Year Built
- 2014
- Length
- 17.1 m (56.1 ft)
- Max Span
- 14.4 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,043
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,543,000
- Total Project Cost
- $2,315,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.