ST 3 PILGRIM HWY over RR MBTA

RR MP 33/885 · County 023, Massachusetts · Built 1954 · 4 Lanes · 89,571 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
K01012AGCDOTNBI
Year Built
1954
Reconstructed
1978
Length
15 m (49.2 ft)
Max Span
13.1 m
Width
31.6 m (103.7 ft)
Lanes
4
Daily Traffic
89,571
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,284,000
Total Project Cost
$4,927,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.