ST 3 PILGRIM HWY over RR MBTA
RR MP 33/885 · County 023, Massachusetts · Built 1954 · 4 Lanes · 89,571 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.994453, -70.719606
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST 3 A/MAIN ST over ST 3 PILGRIM HWY
Built 1948
HWY ELM ST over WATER JONES RIVER
Built 2014
HWY HOWLANDS LN over RR MBTA
Built 1850
HWY SMITHS LN over ST 3 PILGRIM HWY
Built 1958
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
Bridge Details
- Structure #
- K01012AGCDOTNBI
- Year Built
- 1954
- Reconstructed
- 1978
- Length
- 15 m (49.2 ft)
- Max Span
- 13.1 m
- Width
- 31.6 m (103.7 ft)
- Lanes
- 4
- Daily Traffic
- 89,571
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,284,000
- Total Project Cost
- $4,927,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.