HWY EAST ST over ST 3 PILGRIM HWY
.7 MI JCT SUMMER STREET · County 023, Massachusetts · Built 1962 · 2 Lanes · 2,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.037331, -70.724139
This bridge is in worse condition than 32.3% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 64 years old.
Nearby Bridges
HWY ELM ST over ST 3 PILGRIM HWY
Built 1962
ST 14 CONGRESS ST over ST 3 PILGRIM HWY
Built 1962
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
ST 3 SB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 NB/PLGRM HWY over HWY FRANKLIN ST
Built 1962
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 27 PEMBROKE ST over RR MBTA
Built 1958
ST 3 PILGRIM HWY over RR MBTA
Built 1954
Bridge Details
- Structure #
- D140084ATDOTNBI
- Year Built
- 1962
- Length
- 88.1 m (289 ft)
- Max Span
- 23.2 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,993,000
- Total Project Cost
- $7,490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.