HWY ELM ST over ST 3 PILGRIM HWY

1 MI WEST OF ST 3 A · County 023, Massachusetts · Built 1962 · 2 Lanes · 11,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
D140074A7DOTNBI
Year Built
1962
Length
62.8 m (206 ft)
Max Span
22.6 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
11,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,504,000
Total Project Cost
$9,757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.