HWY RIVER ST over ST 3

ADJACENT PINE & STETSON · County 023, Massachusetts · Built 1961 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N240054A6DOTNBI
Year Built
1961
Length
85.6 m (280.8 ft)
Max Span
19.5 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
6,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,208,000
Total Project Cost
$12,313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.