HWY RIVER ST over ST 3
ADJACENT PINE & STETSON · County 023, Massachusetts · Built 1961 · 2 Lanes · 6,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.12705, -70.800919
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 65 years old.
Nearby Bridges
HWY WASHNGTON ST over WATER NORTH RIVER
Built 1904
ST 3 SB over WATER NORTH RIVER
Built 1961
ST 3 NB over WATER NORTH RIVER
Built 1961
ST 53 WASHNGTON ST over WATER NORTH RIVER
Built 1930
HWY SOUTH ST over ST 3
Built 1961
HWY W ELM ST over WATER INDIAN HEAD RIVER
Built 1894
ST 3 SB/PLGRM HWY over ST139 CHURCH ST
Built 1961
ST 3 NB/PLGRM HWY over ST139 CHURCH ST
Built 1961
HWY UNION ST over WATER NORTH RIVER
Built 1920
ST 53 WASHNGTON ST over ST 3 PILGRIM HWY
Built 2012
Bridge Details
- Structure #
- N240054A6DOTNBI
- Year Built
- 1961
- Length
- 85.6 m (280.8 ft)
- Max Span
- 19.5 m
- Width
- 14.7 m (48.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,208,000
- Total Project Cost
- $12,313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.