ST 53 WASHNGTON ST over ST 3 PILGRIM HWY

.5 M S OF NORWELL TL · County 023, Massachusetts · Built 2012 · 4 Lanes · 24,928 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
H06011B9HDOTNBI
Year Built
2012
Length
73.2 m (240.2 ft)
Max Span
31.6 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
24,928
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,044,000
Total Project Cost
$6,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.