ST 53 WASHNGTON ST over ST 3 PILGRIM HWY
.5 M S OF NORWELL TL · County 023, Massachusetts · Built 2012 · 4 Lanes · 24,928 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
42.151047, -70.845514
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 14 years old.
Nearby Bridges
ST 3 NB PLGM HWY over ST123 WEBSTER ST
Built 2019
ST 3 SB PLGM HWY over ST123 WEBSTER ST
Built 2019
HWY SOUTH ST over ST 3
Built 1961
ST 3 SB PLGM HWY over HWY HIGH ST
Built 2019
ST 3 NB PLGM HWY over HWY HIGH ST
Built 2019
ST 3 NB PLGRM HWY over ST228 HINGHAM ST
Built 1960
ST 3 SB PLGRM HWY over ST228 HINGHAM ST
Built 1960
HWY RIVER ST over ST 3
Built 1961
HWY WASHNGTON ST over WATER NORTH RIVER
Built 1904
ST 53 WASHNGTON ST over WATER NORTH RIVER
Built 1930
Bridge Details
- Structure #
- H06011B9HDOTNBI
- Year Built
- 2012
- Length
- 73.2 m (240.2 ft)
- Max Span
- 31.6 m
- Width
- 21 m (68.9 ft)
- Lanes
- 4
- Daily Traffic
- 24,928
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,044,000
- Total Project Cost
- $6,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.